Pre-study questions
- What really needs to be included?
- How much time and capacity are needed?
- Which processes should not come to a standstill?
- What is a realistic moving budget?
- Who makes which decision?
Relocation study
The preparation determines which choices you can make later.
An incomplete inventory, unclear responsibilities or too tight planning often only become visible during implementation. A relocation study identifies these points of interest at an earlier stage.
This way you make choices based on information, with an overview of your moving costs, risks and business continuity.

A relocation study is an independent analysis that maps out your relocation project in advance. Before you compare quotes and determine the implementation plan, we investigate what your organisation needs to make the switch.
We look beyond transport. The operation of your organisation, the readiness of the building and the available resources together determine which approach is feasible.
We will also include the old location. We determine which goods are left behind, what is given a second destination and what is disposed of responsibly. In this way we prepare the release and the agreed handover of the building.

From analysis to decisions
The result is a practical advice document. You can see which assumptions have been confirmed, which choices are still open and what is needed to start responsibly.
Moving costs and budget preparation
Transport is one part. Preparation, disassembly, assembly, specialised treatment, temporary storage and internal deployment can also influence the budget.
We make the items and assumptions visible and compare multiple scenarios where necessary. An estimate is not a supplier quotation: it forms the basis for requesting, comparing and adjusting quotations in a more targeted manner.
We discuss your organisation, objectives and preconditions.
We map buildings, goods, processes and risks.
We will discuss with your interior architect and coordinate the design, moving strategy and planning.
You will receive substantiated advice with priorities and a cost estimate.
We are working out labelling and moving instructions. If desired, we can supervise the move and clearance management until the handover of the old location.
Tell us where you are today. Together we will look at what preparation your project needs.
As soon as a move or redesign becomes concrete, preferably before the final planning and request for quotes. Even if the moving date has already been determined, a study can help to prioritise outstanding choices and risks.
Not necessary. A study can also reveal preconditions for a new location. If the location has not yet been determined, we indicate which conclusions are provisional and must be re-tested later.
That depends on the number of locations, the size, the complexity and the availability of information. We agree on the scope, the required cooperation and the lead time in advance.
No. The study is a separate consultancy assignment. You can use the findings for your own project team and for coordination with implementing partners.